Data Center Construction Site Manager Job at OVHcloud, Warrenton, VA

L2RrQ3VZTHIzSG5lUVhKS1hjWnhlbmdhMlE9PQ==
  • OVHcloud
  • Warrenton, VA

Job Description

Job Description

Job Description

Job Summary
The Data Center Construction Site Manager manages the engineering, design and construction of new production facilities, or the modification of existing facilities. Anticipates, plans, and coordinates the ongoing and future construction requirements for our data center located in Vint Hill, VA. Responsible for preparing and managing technical, logistical, and safety requirements during pre-construction and construction phases.

Base pay range: $125,000 - $135,000 (based on relevant experience).

Essential Duties & Responsibilities
  • Lead the bid, vendor evaluation and selection, and contract negotiation processes.
  • Obtain permits and arranges for inspections.
  • Responsible for developing and adhering to the construction schedule and budget.
  • Monitor construction activities for compliance with internal specifications and external standards and/or regulations.
  • Coordinate the work of contractors/subcontractors during renovation or construction of facilities.
  • Lead the development of scheme design by defining options for construction mode and methodology.
  • Coordinate with local third-party vendors, in collaboration with the PM Design & Commissioning, on the development of general schematics and layouts for electrical distribution, cooling distribution, network structured cabling, and fit-out.
  • Collaborate with PM Design & Commissioning to define the procurement strategy and implement tender processes with the support of the procurement department.
  • Provide daily, weekly, and monthly status reports for each phase of construction.
  • Responsible for the daily management of vendors, adherence to OVHcloud quality requirements, and compliance with federal, state, and local health and safety regulations.
  • Supervise, optimize, and manage material/equipment site reception and storage.
  • Ensure any site design amendments are completed accordingly.
  • Responsible for construction site project quality control and ensuring any technical non-conformities are properly resolved.
Minimum Requirements
  • 8+ years of experience in construction site management.
  • Electrical certification(s) preferred.
  • Bachelor’s degree in engineering or a related field or equivalent applicable experience.
  • Multi-technical construction site experience is required.
  • Expertise in one or more of the following areas: structural, mechanical, cooling, electrical, or BMS.
  • Ability to collaborate effectively in a team environment.
  • Excellent communication and organization skills are required, with strong attention to detail.
  • Ability to identify key internal and external stakeholders, coordinate project plans, and drive successful completion of construction requirements.
Working Conditions
While performing the duties of this job, the employee is frequently required to handle; reach with hands and arms; stoop, kneel, bend, crouch, or crawl. The employee must occasionally lift and/or move up to 50 pounds or more.
Hands-on interaction with mechanical and electrical equipment is required, where safety guidelines must be strictly adhered to while working with such equipment.

Company Description – About OVHcloud
OVHcloud US is a subsidiary of OVHcloud, a global cloud provider that specializes in delivering industry-leading performance and cost-effective solutions to better manage, secure, and scale data. OVHcloud US delivers bare metal servers, hosted private cloud, hybrid and public cloud solutions. OVHcloud manages 43 data centers across 12 sites on four continents, manufacturing its own servers, building its own data centers and deploying its own fiber-optic global network to achieve maximum efficiency. Through the OVHcloud spirit of challenging the status quo, the company brings freedom, security and innovation to solve data challenges – today and tomorrow. With a 25-year heritage, OVHcloud is committed to developing responsible technology and strives to be the driving force behind the next cloud evolution.

EEO Statement
OVHcloud is committed to providing equal employment opportunities to all employees and applicants without regard to race, ethnicity, religion, color, sex (including childbirth, breast feeding, and related medical conditions), gender identity or expression, sexual orientation, national origin, ancestry, citizenship status, uniform service member and veteran status, marital status, pregnancy, age, protected medical condition, genetic information, disability, or any other protected status in accordance with all applicable federal, state and local laws.

 

Powered by JazzHR

frOYgX06Rg

Job Tags

Contract work, For contractors, For subcontractor, Local area,

Similar Jobs

PracticeLink

Pediatrics - Surgery Physician Job with Banner Health in Glendale, AZ (Glendale) Job at PracticeLink

 ...Pediatrics - Surgery Physician Job with Banner Health in Glendale, AZ Join to apply for the Pediatrics - Surgery Physician Job with Banner Health in Glendale...  ..., Dental and Vision Coverage ~ Pet, Auto, and Home Insurance ~ Adoption Assistance, Fertility Benefits... 

Granite State Manufacturing

CNC Mill Turn Lathe Machinist Class A Job at Granite State Manufacturing

 ...implementing operations on routers, programming, setting up and operating mill turn lathes and may include other machine tools and processes....  ...Fanuc control experience preferred. ~ High school diploma or general education degree (GED); or six months related experience and/or... 

Franciscan Missionaries of Our Lady University

Assistant Theology Professor Job at Franciscan Missionaries of Our Lady University

 ...Gospel message in communion with the teachings of the Catholic Church, is seeking a full-time (10-months a year) faculty member in Theology at the assistant or associate level, to start in August 2026. Applicants in dogmatic, systematic, historical, and biblical... 

The Judge Group

Medical Receptionist Job at The Judge Group

Job Title: Associate Patient Care Coordinator (PCC) Location: San Antonio, TX Pay - $16/hr Job Summary: The PCC is responsible for patient telephonic outreach, scheduling, registration, insurance verification, and follow-up appointments to support the Practice...

Pivot OnSite Innovations

Athletic Trainer Job at Pivot OnSite Innovations

Position Overview: Pivot Onsite Innovations has an immediate need for an experienced and passionate Industrial Athletic Trainer in a PRN role (as-needed) at our clients site. This position offers an opportunity to work at a dynamic worksite and make an impact on employee...